The stacker sends the polished or roughened PC components and their pallet from the roller conveyor line to the designated location of the curing chamber;and the cured PC components and their pallet are taken out of the curing pallet and transported to the roller conveyor line
The stacker control system has two control modes, manual and automatic. The automatic mode can set the action cycle arbitrarily, and the site can be unattended.
Equipment composation
Standard item:
n walking system
n frame
n lifting system
n Pallet conveyor system
n Jack/pull pallet mechanism
n Vertical positioning mechanism
n Horizontal positioning mechanism
n Door lift mechanism
n Control System
n Hydraulic system
n controlling software
n Guardrail, cage ladder
Optional item:
o Simulative monitor system
o Video monitor system
o Walking track
Equipment feature
n The lifting system can lift and lower the jacking mould convey system to ensure that the lifting points of the jacking mould convey system are synchronized with each other.
n The stacker has a based on floor running structure, which is conducive to improving the rigidity and stability of the curing chamber.
n The walking system has a guide device and a horizontal positioning device to ensure the accuracy of the vehicle body along the track and the repeated positioning accuracy of the lifting process.
n The jacking system of the mould has vertical fine adjustment and positioning devices to ensure the accuracy of the position of the pallet in the height direction of the curing chamber.
n Program control, automatic signal collection, automatic execution, unattended function can be realized.
n The position and sequence of entering and leaving the curing chamber can be set arbitrarily, and the working cycle can be formed according to the choice.
n The lifting control adopts high-precision absolute value sensor, the position control is accurate, and the accurate position ofpallet is always transmitted.
n The system has the functions of simulation monitoring and video monitoring, which can record the entry and exit time of the pallet of the curing chamber and form a maintenance record chart.
Technical Parameters
Total power of equipment 75kW
Traverse speed 0-22m/min
Traverse power 2×3kW
Gauge 8200mm
Lifting power 55kW
Lifting ability 250kN
Lifting height 8000mm
Lifting speed 0-10m/min
Vertical positioning accuracy ≤2mm
Vertical positioning power 0.75kW
Jacking force 6kN
Jacking speed 9m/min
Jacking power 1.5kW
Jacking stroke 1300mm
Horizontal positioning accuracy ≤2mm
Door lifting force 8kN
Door lifting speed 9m/min
Door lifting stroke 1050mm
Door lifting power 1.5kW
Equipment weight about 24000kg
Iinstructions
1. Outstanding drawing (taking 4000×9000 pallet as an example):
n Template 4000×9000×290mm
n Elevation of conveyor line 400mm
Paired curing chamber:
n Passing layer height 1280mm
n Curing layer height 850mm
n Curing layers 6
2. According to different template types, there are suitable:
n 4000×6000×290mm
n 4000×8000×290mm
n 3500×9000×290mm
n 3500×10000×290mm
n 3200×12000×310mm
Other series of stacker are available, and can also be customized according to customer requirements.
Product detail pictures:
Related Product Guide:
With advanced technologies and facilities, strict high quality regulate, reasonable price tag, excellent support and close co-operation with shoppers, we have been devoted to furnishing the best benefit for our buyers for OEM/ODM China Long Line Bed Concrete Component Side-Shifter - stacker – Xindadi , The product will supply to all over the world, such as: Austria, Peru, Greenland, Our company always concentrate on the development of the international market. We've got a lot of customers in Russia , European countries, the USA, the Middle East countries and Africa countries. We always follow that quality is foundation while service is guarantee to meet all customers.
By ron gravatt from Tanzania - 2018.12.11 11:26
The factory workers have rich industry knowledge and operational experience, we learned a lot in working with them,we are extremely grateful that we can encount a good company has excellent wokers.
By Letitia from Azerbaijan - 2018.09.29 13:24